2017 Seal Coating (C.P. 17-04)

Update 7/10/17: The contractor will be hauling rock and stockpiling at Public Works beginning this week.  Work in the neighborhoods should start within the next several weeks.

The City of Andover completes an annual maintenance program on local city streets. One of the maintenance procedures is seal coating, which protects the existing asphalt surface and extends the life of the pavement. Typically an area will be seal coated the year after it has been crack sealed.

Seal Coating Benefits


Seal coating protects the pavement surface from the deteriorating effects of the sun, water, and weather. When exposed to the elements, asphalt pavement hardens, or oxidizes. Oxidation causes the pavement to become brittle and crack, which reduces the useful life of the pavement. Seal coating slows down this oxidation process and, along with crack sealing, helps keep water from entering the pavement base material. Seal coating also provides low severity crack sealing and restores the surface friction of the roadway, improving the safety of the roadway.

Seal Coating Process


Seal coating includes spraying of an asphalt material on the roadway followed immediately by a layer of aggregate material (fine crushed rock). Within a few days of placement of the aggregate, street sweepers will remove the excess material from the roadways. This work is contracted out to an independent contractor, but is supervised by city staff to assure the work is done according to city specifications.
 
The following areas are scheduled to be seal coated in 2017 sometime between mid July to late August:
    * East half of Zone 7 (east of Hanson Blvd, south of 161st Avenue, north of Crosstown Blvd, and west of the rail road tracks)
    *Country Oaks West   
    *Country Oaks North
    *White Pine Wilderness
    *Grey Oaks
    *Fox Hollow
    *Constance Corners
    *Nightingale Estates
    *Wittington Ridge
    *Nightingale Preserve
    *North Valley Ridge
    *Lund’s Round Lake Estates
    *Indian Meadows 1st, 2nd, 4th and 5th Additions
    *Andover West
    *Fox Meadows
    *Xenia/Vintage St Neighborhood
    *Pine Hills
    *Timber Meadows 3rd Addition
    *Foxberry Farms
    *Jonathan Woods
    *Old Colony Estates
    *Westview Industrial Park.  

 
For project location maps for 2017 click here (PDF).
 
Questions relating to this project can be directed to the Andover Engineering Department at 763-767-5100.